In the two-family house (built in 1962), the upper floor flat was renovated. The house, originally equipped with night
storage heaters, was to continue to be heated with electricity at the owner‘s request, so the E-NERGY CARBON FLEECE
system was used as ceiling heating. This meant that the flat could continue to be occupied during the entire construction
phase.

To optimise energy costs, a PV system on the roof will support the overall installation in the future.

Ceiling plaster: Multi Finish
Surface heating: E-NERGY CARBON FLEECE (110 wm2)
Surface: 150 m²
Area: Upper floor

Let’s talk.

Are you interested in helping make Britain’s homes warmer, greener and more cost-effective places to be? Then speak to Energy Carbon today.

Get in touch

Warning: Undefined variable $phone_count in /var/www/vip2/sites/vip6935273/httpd/htdocs/wp-content/themes/CleanBuild/functions/custom/structured-data.php on line 34

Warning: Undefined variable $email_count in /var/www/vip2/sites/vip6935273/httpd/htdocs/wp-content/themes/CleanBuild/functions/custom/structured-data.php on line 40

Warning: Undefined variable $address_count in /var/www/vip2/sites/vip6935273/httpd/htdocs/wp-content/themes/CleanBuild/functions/custom/structured-data.php on line 46

Warning: Undefined variable $address_line in /var/www/vip2/sites/vip6935273/httpd/htdocs/wp-content/themes/CleanBuild/functions/custom/structured-data.php on line 51

Warning: Undefined variable $social_count in /var/www/vip2/sites/vip6935273/httpd/htdocs/wp-content/themes/CleanBuild/functions/custom/structured-data.php on line 59

Warning: Undefined variable $social_links in /var/www/vip2/sites/vip6935273/httpd/htdocs/wp-content/themes/CleanBuild/functions/custom/structured-data.php on line 60

Warning: Undefined variable $opening_hours in /var/www/vip2/sites/vip6935273/httpd/htdocs/wp-content/themes/CleanBuild/functions/custom/structured-data.php on line 118